Describe a working day
Record the vehicle types, operating hours, expected movement and how pedestrians cross the area. Identify the busiest shift.
Map the space
Include the clear opening, available headroom, side spaces, interior obstructions and the position of nearby equipment in the project drawings.
Coordinate the schedule
Assign an opening number to each bay. Ask the project team to confirm the applicable requirements and coordinate product choices with the building specification.